Assembly loco_animation_thumb.gif (3004 bytes)
click the logo

 

A two stage operation, May 5 and June 23 2001.
Click on photos for larger view; return with your "back" button.

Howie, Bryant and Tom brought the Frame from block Bay to the sled on a 3-Leaf truck

Bryan Boyd used the Broderson loader to set the frame in place.

Others returned for drums, fairlead and boiler.

Brian Crilly, Chet Fee and Bob McLean help set the frame in place.

They installed the drums to complete the May 5 tasks

On June 22, 3-Leaf contracting moved the restored stack, water tank and skyline block to the sled site

With the Broderson Crane, Bryan Boyd lifted the boiler into place, and the team bolted it down.

They installed the lower section of the stack next. Bill Tuba welded parts back together.

With upper section of the stack installed, the donkey takes it's recognised form

Installation of the fairlead on the front of the sled completes the image

Team members for Assembly included Rudi Van Zwaaij, Brian Crilly, Bill Tuba, Brian Boyd,
Jim Southern, Bob Rourke, Tom Sparks, Howie McKamey, Bryant Gaddes, Bob McLean.