Sep 5-8 loco_animation_thumb.gif (3004 bytes)
click the logo

 

On the first weekend, four sets of three 12" metal pipe pilings that would form the foundation were driven into the bank. The culvert and surrounding fill were removed.  (click for larger photo; return with back button)

The 300 trail walkers began using the bypass trail built by the BOMB Squad.

The large shovel with pile driver attached drove in piles and removed the fill

The fill was dragged up to raise the grade five feet, back to the level of the original railway grade.

South side with 3 lower piles and one upper in place